Another day, another floor

I can’t decide if this is big progress or not.  It’s just one more step of many.  The floor is layed.  My body is beat to death from carrying and cutting and handling those 18x18 tiles.  Sometime this week I need to grout the tiles and then I can reinstall the toilet.  As for the shower, the pan liner now has one layer of about six that go into making a shower that doesn’t leak.

It’s a good thing I’m having fun or this’d be unpleasant, hard work.

Masterbath_06-04-2006_002_thumb.jpg

Posted by 'mouse on 06/04 at 09:11 PM
  1. Trust me, it’s big progress.  Molodyetz, sir.

    Posted by Bakerina  on  06/06  at  11:45 AM
  2. Yup, definitely progress. Even ungrouted, that’s so much better than the previous flooring.

    Posted by kimberly  on  06/08  at  09:38 PM
  3. Page 1 of 1 pages

Due to excess spam, you must be logged in to comment.

<< Back to main